Multiple meter swaps without a new installation
To conduct multiple meter swaps among three service points (without a new meter installation at Service Point B), you must first complete a standard Swap & Remove operation, removing Meter 1 from Service Point A and moving Meter 2 from Service Point B to Service Point A. After completing the initial swap (with the option to move or keep the data), perform another Swap & Remove procedure by swapping the newly installed meter at the target service point (Service Point A) with the meter from the other existing service point (Service Point C).
To accomplish this type of meter swap scenario, take the following steps:
-
Using the Swap & Remove procedure, move Meter 2 from Service Point B to Service Point A and remove Meter 1 from Service Point A. This leaves Service Point B without a meter.:
-
Repeat the Swap & Remove procedure, but this time move Meter 3 from Service Point C to Service Point A and remove Meter 2 from Service Point A.