Multiple meter swaps with a new installation
To conduct multiple meter swaps among three service points (with a new meter installation at Service Point B), you must first complete a standard Swap & Remove operation, removing Meter 1 from Service Point A and moving Meter 2 from Service Point B to Service Point A. Then, using the IEE Rich Client user interface, remove Meter 3 from Service Point C and reuse it at Service Point B.
To accomplish this type of meter swap scenario, take the following steps:
-
Using the Swap & Remove procedure, move Meter 2 from Service Point B to Service Point A and remove Meter 1 from Service Point A. This leaves Service Point B without a meter.
-
Remove Meter 3 from Service Point C and connect it to Service Point B.
To perform this operation, use the following procedure:
-
From the IEE Rich Client, navigate to Meter Data Management > Application Data > Program-Based Configuration > Configuration Maintenance.
-
Select Existing. The Search Utility dialog appears. On the Query tab, enter the service point ID for Service Point B in the Value box.
-
Click Next.
-
Select Edit between Meter and Service Point.
-
In the Edit Link Dates - Meter dialog, select the Beginning link date and enter a time (24-hour format: HH:MM). The date and time must match the Effective start date and time selected in Web UI. It is not necessary to change the Ending link date.
-
Click OK.
-
Click Save. Meter 3 is now connected to Service Point B.
-