LinkEndDate
The start/end date and time of the link to remove. If either the LinkEndDate or the LinkStartDate is used, then they must both be used. This attribute allows you to remove a specific link when the same device is linked to the meter for two separate time ranges.
- Data Type: dateTime
- Usage: Optional
Type |
DateTime |
|
Properties |
isRef: 0 |
|
Use |
Collection Manager |
Optional, but required if LinkStartDate is used. |
Performance Manager |
Optional, but required if LinkStartDate is used. |
|
Itron Analytics |
Optional, but required if LinkStartDate is used. |
|
ChoiceConnect Fixed Network |
Optional, but required if LinkStartDate is used. |